9 5 mm ceilings 3 perpendicular 4 400 16 3 8 parallel 4 400 16 12 7 mm ceilings perpendicular 600 24 5 6 1 2 parallel 4 400 16 sidewalls parallel or perpendicular 600 24.
Metal ceiling framing details.
You ll find the industry s broadest range of metal ceiling tiles in curves clouds panels and planks in standard custom or one of a kind looks to meet both your design and functional needs.
Maximum frame spacing drywall construction direct application panel thickness 1 location application method 2 max.
Single layer application mm in.
The metal stud ceiling frame is completed after about 3 hours of continuous work.
If there is no room for a stud above attach short studs to each ceiling stud and screw them to the framing above.
To keep the ceiling from sagging screw a metal stud on edge perpendicular to the studs.
The details contained in this document are intended as a general guide for using steel stud manufacturers association ssma member products.
The best technique for framing steel walls is to first fasten the floor and ceiling tracks and then install the studs one at a time.
On the floor lay out and mark the location of the wall fasten the steel track photo 2 and then locate the position of the ceiling track using a plumb bob or a level held against a steel stud.
Capabilities meet function in our large portfolio of commercial metal ceilings.
Create a submittal or find a distributor here.
Make sure you install the metal studs every 15 25 otherwise they won t be able to support the weight of the plasterboards.
Cemco is the premier manufacturer of steel framing metal lath and specialty products in the united states.
Metal products the modern engineered alternative to traditional timber and blockwork construction gypframe based wall ceiling and floor systems are quicker and easier to install whilst meeting the highest performance requirements.
Contact clarkdietrich technical services at 888 437 3244 for any questions on these details or if you.
These products should not be used in design or construction without an independent evaluation by a qualified engineer or architect to verify the suitability.
Updated clarkdietrich building system cad details can be found in the new clarkdietrich s itools cad library.
The metal tracks and studs are installed firmly therefore the frame is perfectly level as we have used the laser level.
Then cut short studs to attach to that stud to the framing above about every four feet.