Determine if the installation is a through the roof or through the wall installation.
Metalbestos chimney installation instructions.
For example a 6 inch chimney pipe needs to have a square opening that is 12 1 4 inches by 12 1 4 inches.
Class a chimneys insulated double wall metalbestos type improper metal chimney installation.
Make the opening for the finished ceiling support of the chimney on either a joist opening or finished ceiling.
See chimney collapse hazards chimney support bracing.
An improperly sized chimney results in poor draft and excessive creosote formation.
These circumstances the installation of the chimney within the building is strongly recommended.
Please click here for product and technical assistance or a handy rep locator you vent.
By selkirk metalbestos and installation in accordance with these instructions.
Measure a square that is 6 1 4 inches larger than the diameter of the chimney pipe and cut it out with a bi metal hole saw.
Do not install the chimney directly at the outlet of the appliance.
Then from above lower the bucket in place and let it rest on the strips.
The chimney in this photo was not supported is falling and is unsafe.
Select the type of installation by determining where your chimney will run.
Place these strips just inside the cutout edges fig.
Inner pipe with crimped end pointing down into the appliance flue outlet outer black.
Selkirk also manufactures ceiling interior resupport and wall supports and appropriate instructions are packaged with these supports.
As you can see from our photo above left even this superb product can be reduced to shambles when installed by an idiot.
If the chimney must be installed on an exterior wall it is recom mended that the chimney be enclosed below the roof line to protect the chimney from cold outdoor temperatures this may help reduce condensation creosote formation and enhance draft.
Chimney planning step 1.
Install the appliance and chimney system according to the installation instructions provided with them ensuring that the required clearances are maintained contact local building or fire officials about restrictions and installation inspection in your area.